首页> 外文期刊>Journal of architectural and planning research >EVALUATING INTERDEPENDENT ARCHITECTURAL PROJECTS: AN INTEGRATED APPROACH
【24h】

EVALUATING INTERDEPENDENT ARCHITECTURAL PROJECTS: AN INTEGRATED APPROACH

机译:评估相互独立的建筑项目:一种综合方法

获取原文
获取原文并翻译 | 示例
       

摘要

This paper presents an application of the Analytic Network Process (ANP) to an architectural project selection problem. ANP is a method based on Multiple Criteria Decision Analysis (MCDA) that accurately models complex environments. This approach is particularly useful in problems that work with partially available data, qualitative variables, and influences among the variables, which are very common situations in the project evaluation context. It is difficult to select the best set of proposed architectural projects because many factors are involved, such as project risk, corporate goals, and limited availability of the firm's architectural resources. In this paper, we suggest an improved architectural project selection methodology, which reflects interdependencies among evaluation criteria and candidate projects using ANP within a zero-one goal programming (ZOGP) model. In order to provide a systematic approach to setting priorities among multiple criteria and trade-offs among objectives, we suggest that ANP is applied prior to goal programming (GP) formulation. As an illustration, we apply the new approach to a real case study of an architectural project selection problem located in Taichung, Taiwan, using an integrated approach including fuzzy Delphi, ANP, and ZOGP. The results confirm the validity of the methodology and show that the more information that is incorporated into the model, the more accurate the solution will be, so the presented methodology is a good alternative to current architectural project selection evaluation approaches.
机译:本文介绍了分析网络过程(ANP)在建筑项目选择问题中的应用。 ANP是一种基于多标准决策分析(MCDA)的方法,可以对复杂环境进行准确建模。这种方法在处理部分可用数据,定性变量以及变量之间的影响的问题中特别有用,在项目评估环境中这是非常常见的情况。由于涉及许多因素,例如项目风险,企业目标和公司建筑资源的有限可用性,因此很难选择最佳的拟议建筑项目集。在本文中,我们提出了一种改进的建筑项目选择方法,该方法反映了评估标准与候选项目之间的相互依赖关系,该项目在零一目标规划(ZOGP)模型中使用ANP。为了提供一种系统的方法来设定多个标准之间的优先级以及目标之间的权衡,我们建议在制定目标规划(GP)之前应用ANP。作为说明,我们使用包括模糊Delphi,ANP和ZOGP在内的集成方法,将新方法应用于位于台湾台中的建筑项目选择问题的真实案例研究。结果证实了该方法的有效性,并表明,模型中包含的信息越多,解决方案就越准确,因此,所提出的方法是当前建筑项目选择评估方法的良好替代方案。

著录项

  • 来源
    《Journal of architectural and planning research》 |2010年第3期|p.204-218|共15页
  • 作者

    Wann-Ming Wey;

  • 作者单位

    Department of Real Estate and Built Environment, College of Public Affairs, National Taipei University;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:28:07

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号