首页> 外文期刊>Journal of the American Planning Association >Making Room for the River: Applying a Plan Integration for Resilience Scorecard to a Network of Plans in Nijmegen, The Netherlands
【24h】

Making Room for the River: Applying a Plan Integration for Resilience Scorecard to a Network of Plans in Nijmegen, The Netherlands

机译:为河流制作空间:为荷兰尼司根的计划应用程序集成,以便恢复集记分器到荷兰尼济梅的计划网络

获取原文
获取原文并翻译 | 示例
           

摘要

Problem, research strategy, and findings: In this study we analyze plan integration for flood resilience in the city of Nijmegen, the site of the largest Room for the River project in The Netherlands. Little is known about the degree to which local and regional plans are coordinated with the national Room for the River program or about the cumulative influence of plans on flood vulnerability. To effectively investigate these issues, we use and build upon the Plan Integration for Resilience Scorecard (PIRS) concept and method, which analyzes the consistency and effects of networks of plans on community vulnerability. We expand the scope to include plans from multiple administrative scales and the focus to include environmental vulnerability. Using a three-phase evaluation process, we demonstrate that Room for the River policies are well integrated in Nijmegen's network of plans, particularly with respect to flood safety and natural protection. However, we also find that policies at different administrative scales lack consistency in some places, some socially vulnerable neighborhoods receive comparatively little policy attention, and local plans often prioritize development over flood resilience, though higher tier plans sometimes make up for these policy gaps. Flood resilience is still finding its way in the Dutch planning system. Takeaway for practice: The PIRS offers planning practitioners a method to assess how networks of plans influence community vulnerability and, as demonstrated in this analysis, to determine the degree to which plans at multiple administrative scales target the most physically, socially, and environmentally vulnerable geographic areas. It can be used to support the ambitious goals of a program like Room for the River and align them with local development priorities.
机译:问题,研究策略和调查结果:在本研究中,我们分析了荷兰河河项目最大房间的洪水复原力的计划整合。众所周知,本地和区域计划与河流计划国家室或洪水脆弱计划累计影响的程度知之甚少。为了有效地研究这些问题,我们使用并建立在恢复能力记分卡(PIRS)概念和方法的计划集成时,分析了社区漏洞计划网络的一致性和影响。我们扩展范围,包括从多个管理尺度和重点包括环境漏洞的计划。使用三相评估过程,我们展示了河流政策的房间在尼济梅的计划网络中,特别是对于洪水安全和自然保护。然而,我们发现不同行政尺度的政策在某些地方缺乏一致性,一些社会脆弱的社区接受了相对较少的政策关注,并且当地计划通常优先考虑洪水恢复力,尽管有时弥补这些政策差距。洪水恢复力仍在荷兰规划系统中找到了途径。实践外带:PIRS提供规划从业者评估计划网络如何影响社区漏洞的方法,并且如在该分析中所示,确定多个管理尺度的计划的程度是最受身心,社会和环境脆弱的地理地区。它可用于支持河流的房间等节目的雄心勃勃的目标,并将其与当地的发展优先事项对齐。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号