...
首页> 外文期刊>Journal of airport management >Frankfurt Airport's Terminal 3 expansion
【24h】

Frankfurt Airport's Terminal 3 expansion

机译:法兰克福机场3号航站楼扩建

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This paper analyses how Frankfurt Airport (FRA) is continuously evolving as one of Europe's most important aviation hubs. Today, as in the past, FRA continues to meet the challenge of adapting its infrastructure to developments in the global aviation industry. The expansion ofthe airport - with the inauguration of the new Runway Northwest in 2011 and the current construction of Terminal 3 - is generating new capacity, which is vital due to strong growth in passenger traffic. Terminal 3 will make the airport competitive in the premium sector for futuredevelopments in international aviation. The first construction phase of Terminal 3 with piers H and J is planned to open by 2023. This first phase will feature separate levels for arrivals and departures, a marketplace, a food and beverage area and lounges. A new people-mover system and anexpanded baggage handling system will ensure a rapid and smooth link with the existing Terminals 1 and 2 on the northern side of FRA - while also connecting the new terminal to the public transportation network. The plans for the new terminal were designed to be flexible from the outsetand allow for speedy adaptation to market changes. In response to developments in the airline market and the special requirements of non-premium airlines, plans to build a third pier in the second construction phase of Terminal 3 have been moved forward and adapted to the changed requirements.This means that Pier G for non-premium traffic will be up and running as a fully functional building for handling passengers already in 2021, thus alleviating impending capacity constraints at Terminals 1 and 2. Later, the new non-premium pier will be fully integrated into the overall structureof Terminal 3 when the main terminal building and the two other piers are opened.
机译:本文分析了法兰克福机场(FRA)作为欧洲最重要的航空枢纽之一如何不断发展。今天,与以往一样,FRA继续面临着使其基础架构适应全球航空业发展的挑战。随着2011年新的西北跑道的启用以及3号航站楼的现有建设,机场的扩建正在产生新的运力,这对客运量的强劲增长至关重要。 3号航站楼将使机场在国际航空的未来发展中在高端领域具有竞争力。 3号航站楼的第一个建设阶段包括H和J码头,计划于2023年开放。该第一阶段将设有到达和离开,市场,餐饮区和休息室的单独楼层。一个新的人员移动系统和一个扩展的行李处理系统将确保与FRA北侧的现有1号和2号航站楼迅速且顺畅地链接-同时还将新航站楼连接至公共交通网络。新终端的计划从一开始就具有灵活性,并允许快速适应市场变化。为适应航空市场的发展和非优质航空公司的特殊要求,已在3号航站楼第二阶段建造第三个码头的计划已向前推进并适应了变化的要求。 -优质交通将在2021年建成并作为一个功能完备的大楼来处理乘客,从而减轻1号和2号航站楼即将出现的运力限制。后来,新的非优质码头将在3号航站楼的整体结构中完全整合主航站楼和另外两个码头被打开。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号