首页> 外文期刊>Navy international >Hll reports greater progress on Ford-class ships
【24h】

Hll reports greater progress on Ford-class ships

机译:Hll报告福特级船舶取得更大进展

获取原文
获取原文并翻译 | 示例
           

摘要

Huntington Ingalls Industries (HII ) is readying the second Ford-class aircraft carrier John F Kennedy (CVN 79) for launch before the year's end as the shipbuilder makes strides toward fixing more weapons elevators on the lead ship of the class, USS Gerald R Ford (CVN 78). The yard had to delay some of the hull painting on Kennedy during the second week of September due to Hurricane Dorian, which skirted along the US east coast, but Newport News Shipbuilding (NNS) plans to flood the dock where the ship is being built in mid-October, Mike Butler, CVN 79 programme director, told Jane's.
机译:亨廷顿英格尔斯工业公司(HII)正准备在年底前将第二艘福特级航母约翰·肯尼迪(CVN 79)发射,因为造船厂正在努力在该级别的主力船上安装更多的武器升降机,杰拉尔德·R·福特(CVN 78)。由于飓风多利安(Dorian)在美国东海岸沿岸航行,该船厂不得不推迟9月第二周在肯尼迪(Kennedy)的船体绘画,但纽波特纽斯造船厂(NNS)计划淹没该船所在的码头10月中旬,CVN 79程序主管Mike Butler告诉Jane's。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号