...
首页> 外文期刊>Jane's airport review >Frankfurt starts to build third terminal
【24h】

Frankfurt starts to build third terminal

机译:法兰克福开始建造第三个航站楼

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Construction is under way on the new Terminal 3 (T3) at Frankfurt Airport. "We are building the future with Terminal 3 for Frankfurt Airport, the entire Rhine-Main region, and far beyond," Dr Stefan Schulte, CEO of airport operator Fraport, said during a cornerstone-laying ceremony on 29 April. Fraport subsidiary Fraport Ausbau Slid GmbH is managing, supervising, and monitoring the multi-phase Terminal 3 construction project. Costing EUR3.5 billion (USD3.9 billion) to EUR4 billion (USD4.5 billion), it is the largest investment Fraport has ever made at Frankfurt Airport. "Some 500 individual contracts are being awarded for a wide variety of tasks, which is benefiting a large number of small and mid-sized construction companies, including in the Frankfurt region," Fraport stated.
机译:法兰克福机场新的3号航站楼(T3)正在进行建设。机场运营商法兰克福机场集团的首席执行官Stefan Schulte博士在4月29日举行的奠基仪式上说:“我们将通过3号航站楼为整个莱茵河-美因地区以及更远的法兰克福机场建设未来。”法兰克福机场公司的子公司法兰克福机场公司Ausbau Slid GmbH正在管理,监督和监视3号航站楼的多阶段建设项目。这是法兰克福机场集团在法兰克福机场进行的最大一笔投资,耗资35亿欧元(39亿美元)至40亿欧元(45亿美元)。法兰克福机场服务全球公司表示:“大约有500份个人合同被授予执行各种各样的任务,这使包括法兰克福地区在内的众多中小型建筑公司受益。”

著录项

  • 来源
    《Jane's airport review》 |2019年第5期|5-5|共1页
  • 作者

    Ben Vogel;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号