...
首页> 外文期刊>ISIJ international >Simulation and Application of Bottom-Blowing in Electrical Arc Furnace Steelmaking Process
【24h】

Simulation and Application of Bottom-Blowing in Electrical Arc Furnace Steelmaking Process

机译:电弧炉炼钢炉底吹的模拟及应用

获取原文
获取原文并翻译 | 示例

摘要

Characteristics of flow field and stirring effects of six kinds of bottom-blowing arrangements on the molten bath were researched in a 75 t electrical arc furnace. The mixing time was measured by water experiment under different flow rates. Flow field characteristics of three-phase flow were simulated by Fluent software. At the tested conditions for the 75 t EAR it was found that increasing flow rate, weakening impeding force of sidewall and improving stirring effect on the molten bath in EBT (Eccentric Bottom Tapping) region would decrease mixing time and improve stirring ability. Moreover, the flow velocity of molten steel was higher which was near surface of molten bath or near bottom of furnace. Compared with no bottom-blowing conditions at industrial application research, it showed that the bottom-blowing could stir molten better in steelmaking process for the 75 t EAF, which agreed well with the experimental results of the water experiments and the numerical simulations. Finally, an optimum bottom-blowing arrangement was determined.
机译:在75 t电弧炉中研究了6种底吹装置对熔池的流场特性和搅拌效果。通过水实验在不同流速下测量混合时间。用Fluent软件模拟了三相流的流场特性。在75 t EAR的测试条件下,发现增加流量,减弱侧壁的阻力以及改善对EBT(偏心底部攻丝)区域中熔池的搅拌效果会减少混合时间并提高搅拌能力。另外,钢水的流速越高,其接近于熔池表面或炉底附近。与工业应用研究中无底吹条件相比,表明在75吨电弧炉炼钢过程中,底吹能更好地搅拌熔融液,与水实验和数值模拟的实验结果吻合良好。最后,确定了最佳的底吹布置。

著录项

  • 来源
    《ISIJ international 》 |2015年第11期| 2365-2373| 共9页
  • 作者单位

    Beijing Key Laboratory of Research Center of Special Melting and Preparation of High-end Metal Materials, University of Science and Technology Beijing, Beijing, 100083 China,School of Metallurgical and Ecological Engineering, University of Science and Technology Beijing, Beijing, 100083 China;

    Beijing Key Laboratory of Research Center of Special Melting and Preparation of High-end Metal Materials, University of Science and Technology Beijing, Beijing, 100083 China,School of Metallurgical and Ecological Engineering, University of Science and Technology Beijing, Beijing, 100083 China;

    Beijing Key Laboratory of Research Center of Special Melting and Preparation of High-end Metal Materials, University of Science and Technology Beijing, Beijing, 100083 China,School of Metallurgical and Ecological Engineering, University of Science and Technology Beijing, Beijing, 100083 China;

    School of Metallurgical and Ecological Engineering, University of Science and Technology Beijing, Beijing, 100083 China;

    Xining Special Steel CO., LTD, Qinghai, Xining, 810005 China;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    electrical arc furnace; bottom-blowing; water experiment; numerical simulation;

    机译:电弧炉底吹水实验数值模拟;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号