...
首页> 外文期刊>Ironmaking & Steelmaking >High intensity forging for nuclear applications: Manufacturing and properties of nozzle shell with integral flange for EPR reactor pressure vessel
【24h】

High intensity forging for nuclear applications: Manufacturing and properties of nozzle shell with integral flange for EPR reactor pressure vessel

机译:核应用的高强度锻造:EPR反应堆压力容器带有整体法兰的喷嘴壳的制造和性能

获取原文
获取原文并翻译 | 示例
           

摘要

The EPR (European Pressurised Water Reactor) developed by AREVA is a new nuclear reactor designed to achieve greater output (1600 MW) and longer plant life (60 years) than conventional nuclear reactors. The first one is currently under construction in Finland at Olkiluoto. For this new design, an integrated forging was applied for the nozzle shell, including an integral flange (Fig. 1). A 500 t ingot is necessary to manufacture this part, which was the first large part manufactured on a new 14 kt press installed at JSW in 2003. The part was completed 11 months after pouring. The technologies of each manufacturing step and the properties of the part are described.
机译:阿海珐公司开发的EPR(欧洲压水堆)是一种新型核反应堆,旨在实现比传统核反应堆更大的输出功率(1600兆瓦)和更长的设备寿命(60年)。第一个目前正在芬兰的Olkiluoto建造。对于这种新设计,在喷嘴壳上采用了集成的锻件,包括一体的法兰(图1)。制造该零件需要500吨的锭料,这是2003年在JSW安装的一台新的14 kt压力机上制造的第一批大型零件。该零件在浇注后11个月完成。描述了每个制造步骤的技术和零件的特性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号