...
首页> 外文期刊>International Water Power & Dam Construction >Field trials underway at pumped storage plant
【24h】

Field trials underway at pumped storage plant

机译:抽水蓄能工厂正在进行现场试验

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A field trial, which is the first of its kind, is now underway at Germany's second largest power plant to find the most effective combination of materials to use to increase its capacity and upgrade it, reports hydraulic asphalt engineering experts at WALO. Vattenfall Generation, owner of Markersbach pumped storage power plant in Markersbach, Germany, is planning to raise the height and regenerate the upper and lower reservoirs of the plant in 2015-16. This major project to regenerate Markersbach, one of the largest hydro power plants in Europe, may require different technical solutions to ensure optimum and long lasting performance. Four field trials have been set up, covering an area of 3600m2, to test different systems for lining the steep sides of the upper reservoir and re-shaping the dam crest. The results are being monitored over a four year period.
机译:WALO的液压沥青工程专家报告说,这是第一次实地试验,目前正在德国第二大发电厂进行,以寻找最有效的材料组合来增加其容量并对其进行升级。 Vattenfall Generation是德国Markersbach的Markersbach抽水蓄能电站的所有者,该公司计划在2015-16年度提高电站的高度并对其上部和下部水库进行再生。这项旨在再生Markersbach(欧洲最大的水力发电厂之一)的重大项目可能需要不同的技术解决方案,以确保获得最佳且持久的性能。已经建立了四个现场试验,覆盖面积3600平方米,以测试不同的系统来衬砌上部水库的陡峭侧面并重塑坝顶。结果将在四年内进行监控。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号