Based on the current generation development plan, the major hydropower resources in Peninsular Malaysia could be fully harnessed within the next decade. Moving forward, it is conceivable that development will shift to low head schemes constructed in the lower reaches of major rivers. Subject to the penetration of non-hydro renewable resources into the power system, there is also potential for hydro pumped storage projects.
展开▼