Mr Dancet, RAlpin's 2012 transport figures of 95,750 consignments carried on 5,470 trains are lower than last year's total of 104,233 consignments. Dancet: For reasons of which you are aware the year 2012 was challenging for all rail operators. We have the advantage of a long-term outlook. Our mandate from the government is valid until 2018 and beyond. The opening of the Gotthard base tunnel, scheduled for September 2016, will also bring an enormous step forward.
展开▼