首页> 外文期刊>International Transactions on Electrical Energy Systems >Risk-based maintenance for asset management of power transformer: practical experience in Thailand
【24h】

Risk-based maintenance for asset management of power transformer: practical experience in Thailand

机译:基于风险的电力变压器资产管理维护:泰国的实践经验

获取原文
获取原文并翻译 | 示例
           

摘要

Nowadays, the requirement on diminishing operating and maintenance costs is highly concerned for utilitiesrnin competitive electricity market. Power transformer is first focused due to its acquisition costs and failurernconsequences (FCs). Traditional preventive maintenance for power transformer is generally applied. However,rnit is very costly and does not take into account actual transformer condition. Hence, risk-based maintenance isrnintroduced in this paper to facilitate the maintenance works of power transformers. The conditions of powerrntransformers are evaluated from electrical test, insulating oil test and visual inspection by using the rankingrnand weighting techniques. In addition, the Analytic Hierarchy Process (AHP) is proposed to determine the importantrnweighting factor of each transformer component. The three main criteria of the AHP are maintenancerndifficulty, FC and failure history. Moreover, the Weibull distribution techniques are applied to analyze failurerncauses. The computerized web-application program is developed and implemented for practical use in a utilityrnin Thailand. The power transformers installed in 115 kV and 230 kV transmission systems in Thailand arernassessed due to availability and quality of data. From statistical analysis of failure records, the conditions ofrnpower transformer can be divided into three different zones as risk, moderate and healthy zone. The defectiverncomponents in risk zone with higher proportion of failure should be carefully focused. The components andrnoverall condition of the transformers are perceived from the analysis of test results. Subsequently, thernrisk-based maintenance is properly planned according to the actual condition. Therefore, maintenance of powerrntransformer fleet can be effectively managed resulting in higher availability and reliability, lower risk of failurernand lower cost of maintenance. Copyright © 2013 John Wiley & Sons, Ltd.
机译:如今,在竞争激烈的电力市场中,降低运行和维护成本的要求已引起高度关注。首先,由于其购置成本和故障后果(FC),电力变压器成为重点。通常应用电力变压器的传统预防性维护。但是,编织非常昂贵,并且没有考虑变压器的实际状况。因此,本文引入了基于风险的维护,以方便电力变压器的维护工作。使用等级和加权技术,通过电气测试,绝缘油测试和外观检查来评估电力变压器的状态。此外,提出了层次分析法(AHP)来确定每个变压器组件的重要加权因子。 AHP的三个主要标准是维护难度,FC和故障历史记录。此外,采用了威布尔分布技术来分析故障原因。计算机化的网络应用程序是为泰国的一家公用事业公司开发和实施的。由于数据的可用性和质量,对在泰国115 kV和230 kV输电系统中安装的电力变压器进行了评估。从故障记录的统计分析来看,电力变压器的状况可分为危险,中度和健康三个不同区域。应仔细集中风险比例较高的故障区域中的缺陷组件。从测试结果的分析可以看出变压器的组件和总体状况。随后,根据实际情况适当计划基于风险的维护。因此,可以有效地管理电力变压器车队的维护,从而提高可用性和可靠性,降低故障风险并降低维护成本。版权所有©2013 John Wiley&Sons,Ltd.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号