首页> 外文期刊>International Transactions on Electrical Energy Systems >A new approach of generating scheduling in power system with wind power using electrical paths between generators and loads
【24h】

A new approach of generating scheduling in power system with wind power using electrical paths between generators and loads

机译:利用发电机和负载之间的电气路径在具有风力的电力系统中生成调度的新方法

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Due to wind powerfluctuation, it is difficult to make generating schedule of power system with wind power.rnThis paper presents a new approach to make generating schedule using electrical relationships betweenrngenerators and loads. A two-layer structure is used in the approach, i.e. generating schedule is made andrnrevised in on-line time scale in upper layer, and automatic generating control (AGC) is carried out inrnreal-time time scale in lower layer. Both generating schedule-making and AGC are implemented usingrnpower transmission factors among wind farms, related traditional generators and loads. And generatingrnschedule is revised taking the operation limit of generators and transmission congestion into consideration.rnAt last, the technical and economic benefits are analyzed in case study. The results show that the approachrncan effectively trackfluctuation and forecasting error of wind power and enhance the operation quality ofrnentire power system. Copyright © 2013 John Wiley & Sons, Ltd.
机译:由于风力的波动,很难利用风力来制定电力系统的发电计划。本文提出了一种利用发电机与负荷之间的电气关系来制定发电计划的新方法。该方法使用两层结构,即,在上层的在线时间标度中制定和修改生成时间表,并且在下层的实时时间标度中执行自动生成控制(AGC)。风力发电场,相关传统发电机和负载之间的功率传输因子都可以实现发电计划制定和AGC。并考虑到发电机的运行极限和输电拥堵,对发电时间表进行了修改。最后,对案例进行了技术和经济效益分析。结果表明,该方法可以有效跟踪风电的波动和预测误差,提高风电系统的运行质量。版权所有©2013 John Wiley&Sons,Ltd.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号