...
首页> 外文期刊>International Sugar Journal >Ethiopia - New build Tana Beles sugar factory commences operations 7 years later than scheduled date
【24h】

Ethiopia - New build Tana Beles sugar factory commences operations 7 years later than scheduled date

机译:埃塞俄比亚 - 新的Build Tana Beles Sugar Factory在7年后开始运营比预定日期

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

New build Tana Beles sugar factory is located in Amhara Regional State's Jawwi district, some 576 kilometres north-west of Addis Ababa, commenced operations on May 18, 2021. The Ethiopian Prime Minister Abiy Ahmed inaugurated the factory on 6th June, which was originally scheduled to begin operation in 2014.Speaking at the inauguration of Tana Beles No.l sugar factory project, Ahmed praised the China CAMC Engineering Corporation Limited (CAMCE) for finishing the project in less than two years.
机译:新的Build Tana Beles Sugar Factory位于Amhara地区州州州颌骨区,亚的斯亚贝巴西北约576公里,于5月18日开始运营2021年。埃塞俄比亚总理阿希·艾哈迈德于6月6日揭开了该工厂,最初定于安排 在2014年开始运作。 艾哈迈德的达纳贝雷斯号淘乐厂项目的就职典礼推出了中国Camc Engineering Corporation Limited(Camce),以便在不到两年的时间内完成该项目。

著录项

  • 来源
    《International Sugar Journal》 |2021年第1471期|430-430|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号