High-vibration incidents at the Proserpine, Victoria and Plane Creek shredders - actions and response planning

机译:沃尔多齐亚,维多利亚和飞机溪粉碎机的高振动事件 - 行动和响应计划

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

During the 2018 crushing season, Victoria Mill's B side Shredder developed reoccurring high levels of vibration with variability in the phase angle following the processing of low-quality cane. Over a course of weeks, the vibration levels trended upward until reaching unacceptable levels (10 mm/s). Vibration analysis trends indicated an out-of-balance phase angle shift. This followed evidence of a phase-angle shift at the Proserpine Mill when the disc pack was found to be loose. With 10 weeks until the end of crush, attempts were made to reduce the vibrations at Victoria Mill to acceptable levels and manage the operational capacity of the shredder to the end of season by the reduction of load and speed to mitigate the risk of an extended stoppage. Multiple corrective strategies were undertaken over 4 weeks and were unsuccessful. Failed corrective attempts ultimately led to equipment shutdown with a focus on emergency repair. A decision was made to remove the rotor, transport it to the Burdekin and conduct repairs at the Pioneer Mill's Integrated Work Management (1WM) utilising its workforce and skill base. Operations recommenced 8 days following initial equipment shutdown and isolation, 2 days ahead of initially planned. This paper maps the response plan that was adopted to optimize the corrective actions to minimize the operational impact to the business. Learnings saw the creation of a Shredder Response Plan that was implemented during a similar incident at the Plane Creek Mill.
机译:在2018年破碎季节期间,维多利亚磨机的B侧碎纸机在加工低质量蔗可后,在相位角的可变性中开发了高水平的振动。在一期间,振动水平向上趋向于达到不可接受的水平(& 10 mm / s)。振动分析趋势表明了一个平衡的相位角偏移。当发现圆盘包装松动时,这遵循蜡渣磨机的相位角偏移的证据。在粉碎结束后,尝试将维多利亚钢厂的振动降低到可接受的水平,并通过减少负荷和速度来减少延长停机的风险来管理赛季粉碎机的运行能力。在4周内进行了多种纠正策略,并未成功。失败的纠正尝试最终导致设备关注,专注于紧急修复。采取决定以拆下转子,将其运输到Burdekin,并在Pioneer Mill的综合工作管理(1WM)上进行维修,利用其劳动力和技能基础。初始设备关闭和隔离后,操作需要8天,提前2天提前计划。本文地图采用优化纠正措施的响应计划,以最大限度地减少对业务的运营影响。学习在平面溪厂的类似事件中实施了粉碎机响应计划。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号