首页> 外文期刊>International journal of risk assessment and management >Multivariate methods in enterprise system implementation, risk management and change management
【24h】

Multivariate methods in enterprise system implementation, risk management and change management

机译:企业系统实施,风险管理和变更管理中的多元方法

获取原文
获取原文并翻译 | 示例
       

摘要

This work is a first step towards the application of multivariate methods in risk management and change management in Enterprise System Implementation (ESI). ESI is characterised by concentrated efforts to integrate an IT system. Such projects typically experience unplanned problems and events, which may lead to major restructuring of the process. In this work, we rely on ESI theory developed by the Better Enterprise SysTem (BEST) project and more conventional risk management methodology. Both change management and risk management consist of data collection and data analysis. We will show that the data structures of both efforts are similar so that similar data analysis techniques are applicable. In fact one can consider change management as a special case of risk management. This paper focuses on the application of multivariate methods in comparing risk profiles and readiness assessments at various stages of an ESI project. The techniques are correspondence analysis and partial order mapping, which help to characterise and compare ESI readiness across different parts of a company and compare risk profiles of different ESI components.
机译:这项工作是将多元方法应用到企业系统实施(ESI)的风险管理和变更管理中的第一步。 ESI的特点是致力于整合IT系统。这样的项目通常会遇到计划外的问题和事件,这可能导致流程的重大重组。在这项工作中,我们依赖于由Better Enterprise SysTem(BEST)项目开发的ESI理论和更常规的风险管理方法。变更管理和风险管理都包括数据收集和数据分析。我们将证明这两个工作的数据结构相似,因此类似的数据分析技术也适用。实际上,可以将变更管理视为风险管理的一种特殊情况。本文着重介绍多元方法在比较ESI项目各个阶段的风险状况和准备情况评估中的应用。这些技术是对应分析和部分订单映射,它们有助于表征和比较公司不同部门之间的ESI准备情况,并比较不同ESI组件的风险状况。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号