首页> 外文期刊>International Journal of Project Management >Breaking the vicious cycle of flood disasters: Goals of project management in post-disaster rebuild projects
【24h】

Breaking the vicious cycle of flood disasters: Goals of project management in post-disaster rebuild projects

机译:打破洪水灾害的恶性循环:灾后重建项目的项目管理目标

获取原文
获取原文并翻译 | 示例
           

摘要

Korea has witnessed a significant number of post-disaster rebuild (PDR) projects following flood damages caused by unforeseeable super-typhoons. Efforts to improve the management performance of such projects are mostly limited to the development of several administrative guidelines for faster construction starts to avoid secondary damage from subsequent typhoons. However, no explicit and comprehensive studies have thus far been initiated to identify the causes of low performance outcomes of flood PDR projects in quantitative and qualitative ways. Hence, this study performed macro- and micro-level analyses to provide an overall view of the performance of flood PDR projects as well as created a comprehensive cause and effect (C&E) diagram, which reveals 12 major factors and 19 sub-factors adversely affecting the project outcomes. The findings of this study are expected to be useful in improving current project management capability as well as relevant laws and regulations both in Korea and in developing countries.
机译:由于不可预知的超级台风造成的洪灾,韩国见证了许多灾后重建(PDR)项目。改善此类项目的管理绩效的努力主要限于为加快施工开始而制定的一些行政指导,以避免后续台风造成的二次破坏。但是,到目前为止,尚未开始进行明确和全面的研究以定量和定性的方式确定洪水PDR项目绩效不佳的原因。因此,本研究进行了宏观和微观分析,以全面了解洪水PDR项目的绩效,并创建了全面的因果图(C&E)图,该图揭示了12个主要因素和19个次要因素项目成果。预期这项研究的结果将有助于提高韩国和发展中国家目前的项目管理能力以及相关法律法规。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号