Selecting risk response strategies considering project risk interdependence

机译:考虑项目风险相互依赖关系的风险应对策略选择

获取原文
获取原文并翻译 | 示例
       

摘要

In risk response analysis, risks are often assumed independently. In fact, however, risks in a project mutually affect and the independent risk seldom exists in reality. This paper provides an approach to quantitatively measure the risk interdependence. Based on the analysis of the risk interdependence, we construct an optimization model for selecting risk response strategies considering the expected risk loss, risk interdependence and its two directions. Further, the effects of the risk interdependence on risk response can be investigated. There are two major findings by the analysis of the case project. First, the expected utility would be more sensitive to the risk interdependence itself than to the directions of it. Second, the insufficient attention paid to or neglect of the risk interdependence would lower the expected utility and increase the implementation cost. (C) 2016 Elsevier Ltd. APM and IPMA. All rights reserved.
机译:在风险响应分析中,风险通常是独立承担的。但是,实际上,项目中的风险是相互影响的,实际上很少存在独立风险。本文提供了一种定量度量风险相互依赖性的方法。在对风险相互依赖关系进行分析的基础上,构建了考虑预期风险损失,风险相互依赖关系及其两个方向的风险选择策略优化模型。此外,可以研究风险相互依存关系对风险响应的影响。通过对案例项目的分析,有两个主要发现。首先,预期效用对风险相互依赖性本身比对它的方向更为敏感。其次,对风险相互依存的关注不足或忽视会降低预期效用并增加实施成本。 (C)2016 Elsevier Ltd. APM和IPMA。版权所有。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号