Project logistics: integrating the procurement and construction processes

机译:项目物流:整合采购和建设流程

获取原文
获取原文并翻译 | 示例
       

摘要

The paper presents a stochastic model to plan the delivery of material to a building site, in view of ensuring the continuity of the construction process. The model assesses the amount of ma- terial that should be available at the site at a given time to guarantee the desired level of protec- tion against changes in delivery dates and the rate of progress. The model my be used in early project planning, when detailed analysis based on network techniques is not yet available, and represents a basic toll for the aggregate management of the procurement, expediting and trans- port activities involving materials delivery to sites.
机译:考虑到确保施工过程的连续性,本文提出了一种随机模型来计划将材料运送到建筑工地。该模型评估在给定时间现场应可提供的材料数量,以保证所需的保护水平以防止交货日期和进度的变化。当尚无基于网络技术的详细分析时,该模型可用于早期项目规划,它代表了涉及到现场物料交付的采购,加急和运输活动的总体管理的基本费用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号