首页> 外文期刊>Journal of Producitivity and perfoemance management >Performance management implementation challenges in Ghana's local government system Evidence from the Sefwi Wiawso Municipal Assembly
【24h】

Performance management implementation challenges in Ghana's local government system Evidence from the Sefwi Wiawso Municipal Assembly

机译:加纳地方政府系统中绩效管理实施的挑战来自塞夫维·威索市政议会的证据

获取原文
获取原文并翻译 | 示例
       

摘要

Purpose - The purpose of this paper is to investigate the current performance management system of the Sefwi Wiawso Municipal Assembly as well as the challenges faced by the Assembly in implementing its performance management system. Design/methodology/approach - The specific design that was adopted is the case study approach. The primary data were gathered through in-depth interviews. In total, 20 heads of departments and employees were purposively sampled. The data gathered from the interviews were analysed using Miles and Huberman's (1994) approach to qualitative data analysis. Findings - The paper reveals that the performance management system of the Assembly has not been effective. The study also reveals poor communication, poor integration, low commitment by the top officials, absence of training, inadequate capacity for setting clear targets and objectives, and measuring and evaluation criteria for performance assessment, cultural issues, absence of rewards for good performance, financial constraints, weak and highly bureaucratic management systems as challenges facing performance management system of the assembly. Practical implications - This study indicates that the training of supervisors and the linking of performance management systems with reward and recognition are key to ensuring an effective implementation of the performance management system of the Assembly. Originality/value - This paper contributes to literature by examining the performance management system of the Sefwi Wiawso Municipal Assembly in the Western Region of Ghana by describing and drawing lessons from local government experiences in the implementation of performance management systems in developing countries.
机译:目的-本文的目的是调查塞弗维·维索索市议会目前的绩效管理系统,以及议会在实施其绩效管理系统时面临的挑战。设计/方法/方法-采用的特定设计是案例研究方法。通过深度访谈收集了主要数据。总共抽取了20名部门负责人和员工作为样本。使用Miles和Huberman(1994)的方法对从访谈中收集的数据进行定性数据分析。调查结果-该文件表明,大会的绩效管理系统没有有效。该研究还显示,沟通不畅,整合性差,高级官员承诺不力,缺乏培训,制定明确指标和目标的能力不足,绩效评估的衡量和评估标准,文化问题,缺乏对绩效的奖励,财务状况约束,薄弱和高度官僚化的管理系统,这是大会绩效管理系统所面临的挑战。实际意义-这项研究表明,对监督员的培训以及绩效管理系统与奖励和表彰的联系是确保有效实施大会绩效管理系统的关键。原创性/价值-本文通过描述和借鉴地方政府在发展中国家实施绩效管理系统的经验教训,研究了加纳西部地区Sefwi Wiawso市议会的绩效管理系统,为文献研究做出了贡献。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号