首页> 外文期刊>International Journal of Production Research >Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies
【24h】

Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies

机译:物料处理和制造活动的集成计划,用于及时生产复杂组件

获取原文
获取原文并翻译 | 示例
       

摘要

This paper considers the simultaneous scheduling of material handling trans- proters (such as automatic guided vehicles or AGVs) and manufacturing equip- ment (such as machines and workcentres) in the production of complex asembled product. Given the shipping schedule for the end-items, the objective of the integrated problem is to minimize the cumulative lead time of the overall produc- tion schedule (i.e. total makespan) for on-time shipment, and to reduce material handling and inventory holding cots on the shop-floor.
机译:本文考虑了在复杂组装产品的生产中同时调度物料搬运运输工具(例如自动引导车辆或AGV)和制造设备(例如机器和工作中心)的时间。给定最终产品的装运时间表,集成问题的目的是最大程度地减少按时装运的总体生产时间表(即总工期)的累计交货时间,并减少物料搬运和库存存放婴儿床在车间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号