首页> 外文期刊>International Journal of Production Research >ISTS: a new procedure for the integrated scheduling of multi-stage systems
【24h】

ISTS: a new procedure for the integrated scheduling of multi-stage systems

机译:ISTS:用于多阶段系统集成调度的新程序

获取原文
获取原文并翻译 | 示例
       

摘要

This paper addresses the problem of scheduling a two-stage manufacturing system. MRP systems have been developed to synchronize production in multi- stage system, assigning due dates to production at each stage. However, MRP systems allow just a broad scheduling and it is therefore up to the short tem scheduling system to meet such due dates.
机译:本文解决了调度两阶段制造系统的问题。已开发出MRP系统,以在多阶段系统中同步生产,并在每个阶段为生产分配到期日期。但是,MRP系统只允许进行广泛的调度,因此,由短期调度系统来满足这些到期日期是最重要的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号