首页> 外文期刊>International Journal of Production Research >New dispatching rules for shop scheduling: a step forward
【24h】

New dispatching rules for shop scheduling: a step forward

机译:车间调度的新调度规则:前进的一步

获取原文
获取原文并翻译 | 示例
       

摘要

This paper provides a set of new dispatching rules for the minimization of various performance measures such as mean, maximum and variance of flow time and tardiness in dynamic shops. A static rule which minimizes the number of tardy jobs is also proposed. To evaluated these proposed rules, their relative performance is analysed in open job shops and reported in comparison with the standard benchmark rules such as the SPT (shortest process time) and EDD (earliest due-date), popular rules like ATC (apparent tardiness cost) and MOD (modified operational due-date), and the best performing rules in current literature such as RR, PT+WINQ, PT+WINQ+SL and AT-RPT.
机译:本文提供了一套新的调度规则,以最小化各种性能指标,例如动态车间中流动时间的平均数,最大值和方差以及延误。还提出了一个静态规则,该规则可将迟到的工作数量降至最低。为了评估这些提议的规则,他们在露天工作场所中对它们的相对性能进行了分析,并与标准基准规则(例如SPT(最短处理时间)和EDD(最早到期)),流行规则(例如ATC(表观迟到成本))进行比较)和MOD(修改的操作到期日期),以及当前文献中表现最好的规则,例如RR,PT + WINQ,PT + WINQ + SL和AT-RPT。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号