首页> 外文期刊>International Journal of Production Research >Improving a practical DBR buffering approach using Workload Control
【24h】

Improving a practical DBR buffering approach using Workload Control

机译:使用工作负载控制改进实用的DBR缓冲方法

获取原文
获取原文并翻译 | 示例
       

摘要

This paper deals with improving the lead-time performance of a small packaging manufacturer in the Netherlands that had already implemented several facets of Theory of Constraints (TOC) in 1997. Since then, delivery reliability and profits have increased and lead-times reduced substantially. In an attempt to achieve further lead-time improvements in 2001, the firm recently encountered some limitations of its partial TOC implementation. In this paper we focus on the modifications of its order acceptance and buffer management system that were necessary in order to obtain the desired lead-time reduction. We describe how Workload Control principles were introduced to improve the buffering approach and planning procedures the firm had been using since 1997. It shows that Workload Control provides effective tools that can be used in combination with the Drum-Buffer-Rope mechanism in order to balance the flow of work to the production floor.
机译:本文旨在提高荷兰一家小型包装制造商的交货时间性能,该制造商已在1997年实施了约束理论(TOC)的多个方面。此后,交货可靠性和利润得到提高,交货时间大大减少。为了在2001年进一步改进交货时间,该公司最近遇到了部分实施TOC的局限性。在本文中,我们着重于对其订单接受和缓冲区管理系统的修改,这些修改对于获得所需的交货时间减少是必需的。我们描述了如何引入工作负载控制原理以改善公司自1997年以来一直使用的缓冲方法和计划程序。这表明工作负载控制提供了可与鼓-缓冲区-绳索机制结合使用以平衡的有效工具。工作流向生产车间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号