Hierarchical production planning and scheduling in make-to-order environments: reaching short and reliable delivery dates

机译:按订单生产环境中的分层生产计划和计划:达到短而可靠的交货日期

获取原文
获取原文并翻译 | 示例
       

摘要

This study proposes a novel hierarchical production planning (HPP) structure for make-to-order (MTO) companies. The proposed HPP structure contains three decision making levels: (1) the order entry level, (2) the order release level and (3) the order sequencing/dispatching level. The objective is to manage the delivery dates of arriving orders in order to reach short and reliable delivery dates using appropriate decision making techniques at each level. At the first level, the main decision concerns the acceptance or rejection of new arriving orders subject to some relevant limitations (e.g. capacity constraint). At this level, an extended version of our previously proposed model (Ebadian, M., et ah, 2007. A new decision making structure for the order entry stage in make-to-order environments. International Journal of Production Economics, 111, 351-367.) is applied. Besides rejecting some of the low priority orders, determination of delivery dates and prices for the non-rejected orders constitute the other outputs of this level. The second level is related to releasing the accepted orders to the shop floor. The decision making problems at this level include which orders and when they can be released. We develop a new order release method which improves the delivery date performance through generating a smoothed production schedule. Finally, at the third level, a modified dispatching rule is proposed to sequence the existing orders at each workstation so that the previously agreed delivery dates can be met. The proposed models at the second and third levels are validated through a number of numerical experiments conducted by simulation studies and the corresponding results are discussed in details.
机译:这项研究为按订单生产(MTO)的公司提出了一种新颖的分层生产计划(HPP)结构。提出的HPP结构包含三个决策级别:(1)订单输入级别,(2)订单下达级别和(3)订单排序/调度级别。目的是使用每个级别上的适当决策技术来管理到达的订单的交货日期,以便达到短而可靠的交货日期。在第一层,主要决策涉及接受或拒绝新到达的订单,但要受到一些相关限制(例如,容量限制)。在此级别上,我们先前提出的模型的扩展版本(Ebadian,M.等,2007年。按订单生产环境中订单输入阶段的新决策结构。《国际生产经济学杂志》 111、351 -367。)。除了拒绝一些低优先级的订单外,确定未拒绝订单的交货日期和价格构成了该级别的其他输出。第二级与将接受的订单下达到车间有关。此级别的决策问题包括哪些订单以及何时可以下达。我们开发了一种新的订单下达方法,该方法可以通过生成平滑的生产计划来改善交货日期性能。最后,在第三级,提出了修改后的调度规则,以对每个工作站上的现有订单进行排序,以便可以满足先前约定的交货日期。通过模拟研究进行的大量数值实验验证了在第二和第三级提出的模型,并详细讨论了相应的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号