Production lead-time hedging and coordination in prefabricated construction supply chain management

机译:预制建筑供应链管理中的生产提前期对冲与协调

获取原文
获取原文并翻译 | 示例
       

摘要

This paper studies a coordination scheme to solve a production lead-time hedging (PLTH) issue in the prefabricated construction supply chain management. To mitigate tardiness delivery owing to prefab production uncertainty, the project contractor (PC) prefers to inform the prefab factory (PF) an earlier due date which is termed as PLTH strategy. However, this strategy forces the PF to compress its production process. A balance must be optimised through the proposed PLTH coordination scheme. It includes a PLTH-related cost term, i.e. crashing money (charged by the PF to the PC) and a constant transfer term. Three models with different power structures are considered. Firstly, two Stackelberg games with alternative decision-making sequences and an equal power model are discussed to obtain the optimal PLTH amount and crashing money. Later on, a cost-sharing term is used to fairly allocate the system surplus. It is observed that this coordination scheme reduces the PLTH amount and ensures win-win coordination for both parties. Some interesting managerial implications are also obtained from comparison analysis and numerical studies.
机译:本文研究了一种协调方案,以解决预制建筑供应链管理中的生产提前期套期保值(PLTH)问题。为了减轻由于预制件生产的不确定性而延误交货的时间,项目承包商(PC)希望提前通知预制件工厂(PF),这被称为PLTH策略。但是,此策略迫使PF压缩其生产过程。必须通过建议的PLTH协调方案来优化余额。它包括与PLTH相关的成本条件,即崩溃资金(由PF向PC收取)和固定的转移条件。考虑了三种具有不同功率结构的模型。首先,讨论了两个具有替代决策序列和相等功率模型的Stackelberg游戏,以获得最优的PLTH数量和巨额资金。以后,使用成本分摊项来公平分配系统盈余。可以看出,这种协调方案减少了PLTH量,并确保了双方的双赢协调。从比较分析和数值研究中也可以获得一些有趣的管理含义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号