SHORT-TERM GENERATION SCHEDULING FOR ENERGY CONSUMPTION MINIMIZATION OF LARGE-SCALE HYDRO SYSTEMS

机译:大型水电系统能耗最小化的短期发电调度

获取原文
获取原文并翻译 | 示例
       

摘要

In hydro systems, the problem of energy consumption minimization can be simply expressed as follows: given a load demand process, schedule the generation of hydroplants such that the potential energy at the end-of-study is maximal. To solve this problem, the authors design a procedure in which a set of search directions is first defined and then, based on the principle of reaching the equal derivative, one of the defined directions is selected at a time, in the order of favourableness of improving the objective, to meet the power demand stage-by-stage. The constraints on plant-based power ramp, minimum up/down time, up/down frequency, running scope, capacity reserve for electric power system, and so on are taken into account. With Pujian hydro systems as an example, the presented model and its solving method are practically tested and found to be efficient.
机译:在水力系统中,将能耗最小化的问题可以简单表示为:给定负荷需求过程,安排水力发电厂的生产,以使研究结束时的势能最大。为了解决这个问题,作者设计了一个过程,在该过程中首先定义一组搜索方向,然后根据达到相等导数的原理,一次选择一个定义的方向,顺序为:改善目标,逐步满足电力需求。考虑了基于工厂的功率斜坡,最小上/下时间,上/下频率,运行范围,电力系统容量储备等方面的限制。以浦江水利发电系统为例,对所提出的模型及其求解方法进行了实际测试,发现是有效的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号