首页> 外文期刊>International Journal of Plant Engineering and Management >Determination of Time for Conducting Preventive Maintenance Using Hybrid Analysis
【24h】

Determination of Time for Conducting Preventive Maintenance Using Hybrid Analysis

机译:使用混合分析确定进行预防性维护的时间

获取原文
获取原文并翻译 | 示例
           

摘要

It becomes a common practice to determine time for conducting preventive maintenance (PM) using a hazard Junction and an alarm limit on a specified failure rate. In this paper, the authors argue that using both hazard and reliability functions can improve the accuracy of the result, especially when the whole-life characteristic failure is modelled using different failure distributions. The PM time predicted based on the hazard function should be checked against reliability.
机译:使用危险连接点和指定故障率的警报限制来确定执行预防性维护(PM)的时间已成为一种常见的做法。在本文中,作者认为,同时使用危害函数和可靠性函数可以提高结果的准确性,尤其是当使用不同的故障分布对整个寿命特征故障进行建模时。应检查基于危害函数预测的PM时间的可靠性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号