首页> 外文期刊>International journal of multicriteria decision making >Territorial intelligence modelling for energy development (TIMED) - a case study for the Baie-des-Sables (Canada) wind farm
【24h】

Territorial intelligence modelling for energy development (TIMED) - a case study for the Baie-des-Sables (Canada) wind farm

机译:能源开发的地域智能建模(TIMED)-以Baie-des-Sables(加拿大)风电场为例

获取原文
获取原文并翻译 | 示例
       

摘要

This paper presents the application of a new approach, territorial intelligence modelling for energy development (TIMED), developed in response to growing concerns about the social acceptance of wind farms. Project development is based on procedure transparency and involvement of all stakeholders. To do this, the TIMED approach involves two multi-criteria methods: multi-criteria decision aid (MCDA) and participatory and collaborative geographic information systems (G1S). The model was tested in the Baie-des-Sables wind farm plan located in Quebec, Canada. This was done as an academic research and did not impact the current operation of the farm, which started back in November 2006. If this approach requires more efforts from the wind farm developer at the preparation stage it has the advantages of reducing the risks and overall duration of the infrastructure launching.
机译:本文介绍了一种新方法的应用,即用于能源开发的区域智能模型(TIMED),该方法是针对对风电场的社会接受度日益增长的关注而开发的。项目开发基于程序透明性和所有利益相关者的参与。为此,TIMED方法涉及两种多准则方法:多准则决策辅助(MCDA)和参与式协作地理信息系统(G1S)。该模型已在加拿大魁北克的Baie-des-Sables风电场计划中进行了测试。这项工作是一项学术研究,并未影响自2006年11月开始的农场的当前运营。如果这种方法在准备阶段需要风电场开发商更多的努力,则具有降低风险和降低总体风险的优势。基础架构启动的持续时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号