首页> 外文期刊>International journal of mathematics in operational research >Fuzzy critical path analysis based on centroid of centroids of fuzzy numbers and new subtraction method
【24h】

Fuzzy critical path analysis based on centroid of centroids of fuzzy numbers and new subtraction method

机译:基于模糊数质心和新减法的模糊临界路径分析

获取原文
获取原文并翻译 | 示例
       

摘要

This paper proposes a new method to solve fuzzy critical path problems for a project network with activity times being normalised trapezoidal fuzzy numbers. The prime idea of this paper is to propose a new method to find the maximum and minimum of fuzzy numbers which can be applied to find the fuzzy earliest starting times and the fuzzy latest finish times. This method replaces the extended subtraction operation by a new subtraction operation to find fuzzy latest finish times. An example with activity times being trapezoidal fuzzy numbers in previous studies is solved successfully to demonstrate the validity of the proposed approach.
机译:针对活动时间为标准化梯形模糊数的工程网络,提出了一种解决模糊关键路径问题的新方法。本文的主要思想是提出一种确定模糊数的最大值和最小值的新方法,该方法可用于找到模糊最早的开始时间和模糊最新的结束时间。该方法用新的减法运算代替扩展的减法运算,以找到模糊的最新完成时间。在以前的研究中,以活动时间为梯形模糊数为例,成功解决了该问题,以证明该方法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号