首页> 外文期刊>International journal of low carbon technologies >Utilizing district energy system as a cost-effective measure in meeting UK domestic 'zero carbon' targets
【24h】

Utilizing district energy system as a cost-effective measure in meeting UK domestic 'zero carbon' targets

机译:利用区域能源系统作为符合英国国内“零碳”目标的经济有效措施

获取原文
获取原文并翻译 | 示例
           

摘要

In 2007, the UK government announced that all new homes are to be 'zero carbon' by 2016. At present, zero carbon dwellings are significantly expensive to achieve, costing up to 40% more in capital costs than conventional building. Delivering the energy through a district energy supply achieves zero carbon at considerably less cost. This paper concluded that district energy using a large wind turbine and community biomass boiler could reduce technological capital costs by £20 000 (70%) per 128 m dwelling. It was estimated that a district energy can save £35 000 in capital and running costs over a 30 year life cycle.
机译:2007年,英国政府宣布,到2016年所有新房屋都将实现“零碳”。目前,零碳住宅的实现成本非常高,其资本成本比传统建筑高40%。通过区域能源供应来提供能源,可以以更低的成本实现零碳排放。本文的结论是,使用大型风力涡轮机和社区生物质锅炉的区域能源可将每128 m住宅的技术资本成本降低£20 000(70%)。据估计,在30年的生命周期中,区域能源可以节省35,000英镑的资本和运营成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号