首页> 外文期刊>International Journal of Innovative Computing Information and Control >DYNAMIC PROGRAMMING ALGORITHM AND BAT ALGORITHM BASED STORM NODES SCHEDULING IN EDGE COMPUTING
【24h】

DYNAMIC PROGRAMMING ALGORITHM AND BAT ALGORITHM BASED STORM NODES SCHEDULING IN EDGE COMPUTING

机译:基于动态编程算法和边缘计算中的STORM节点的蝙蝠算法

获取原文
获取原文并翻译 | 示例
           

摘要

The high communication delay and uneven load among heterogeneous edge nodes are affecting the performance of edge computing, and they are almost impossible to be solved by the traditional cloud computing platforms. In this paper, we address these problems by studying the scheduling optimization method for the storm nodes in edge computing environments. At first, a storm scheduling model is established, where server cluster structure and schedule workflow are formulated. Then, a heuristic dynamic programming algorithm is proposed to address the general scheduling issue and a bat-based scheduling strategy is proposed to address a special case faced by the heuristic dynamic programming algorithm. Finally, the experimental results show that the proposed algorithm can minimize the communication cost and guarantee the minimum scheduling requirements.
机译:异构边缘节点之间的高通信延迟和不均匀载荷影响了边缘计算的性能,并且传统的云计算平台几乎不可能解决。在本文中,我们通过研究边缘计算环境中的风暴节点的调度优化方法来解决这些问题。首先,建立了Storm调度模型,其中制定了服务器群集结构和计划工作流程。然后,提出了一种启发式动态编程算法来解决一般调度问题,并且提出了基于BAT的调度策略来解决启发式动态编程算法面临的特殊情况。最后,实验结果表明,该算法可以最小化通信成本并保证最低调度要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号