...
首页> 外文期刊>International Journal on Hydropower & Dams >Alstom delivers the first stayring for Santo Antonio do Jari, Brazil
【24h】

Alstom delivers the first stayring for Santo Antonio do Jari, Brazil

机译:阿尔斯通为巴西圣安东尼奥·杜·哈里(Santo Antonio do Jari)提供第一批住宿

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Santo Antonio do Jari hydro plant, owned by EDP in Brazil and equipped by Alstom, will receive its first stayring soon. It is one of the project's key milestones. This equipment, which weighs approximately 120 tons, is one of the main components of the turbine. The stayring ensures the homogenous distribution of water into the turbine, to allow the movement of runner blades to generate power.
机译:EDP​​在巴西拥有的,由阿尔斯通(Alstom)装备的Santo Antonio do Jari水力发电厂将很快收到其第一笔款项。这是项目的关键里程碑之一。该设备重约120吨,是涡轮机的主要组件之一。止动环确保水均匀地分布到涡轮机中,从而使转轮叶片的运动产生动力。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号