...
首页> 外文期刊>The international journal on hydropower & dams >Speedy construction of the highest RCC gravity dam in Lao PDR
【24h】

Speedy construction of the highest RCC gravity dam in Lao PDR

机译:老挝最高RCC重力坝的快速建设

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The outstanding production rate of RCC placement achieved during the construction of the main dam at the Nam Ngiep 1 hydro project ranks this RCC dam as one of the fastest to be constructed in the world to date, but also ranked it as one of the most efficiently constructed dams in terms of batching plant rated capacity and actual quantities of RCC produced and placed. This paper discusses the construction techniques and solutions adopted during construction to achieve high productivity and efficiency while retaining the required high quality. @@1. Forbes, B., "Innovation of significance and their development on some recent RCC dams", 6th international Symposium on Roller Compacted Concrete (RCC) dams, Zaragoza, Spain; 2012. @@2. Dunstan, M.R.H., "The first 30 years of RCC dams: Technical progress on substantial hydropower development and Roller Compacted Concrete dams", CHINCOLD Publication, 2015. @@3. Dunstan, M.R.H., "How fast should an RCC be constructed? Technical progress on substantial hydropower development and Roller Compacted Concrete dams", CHINCOLD Publication; 2015. @@4. Aosaka, Y., Seoaka, T., Forbes, B., Cockcroft, JJE.M., Murakami, Y., and Asakawa, M., "Trial mix and full-scale trial embankment for RCC dam at Nam Ngiep 1 Hydropower Project", Proceedings, 85th Annual Meeting of ICOLD, Prague, Czech Republic; 2017. @@5. Matsumoto, Y., Munnavongchanh, K., Kosaka, K., and Cockcroft, J.EM., "An Overview of the Nam Ngiep 1 Hydropower Project including Design and Construction of the Highest Dam in Lao PDR", Proceedings, Sixth International Conference on Water Resources and Hydropower Development in Asia, Vientiane, Lao PDR, 2016.
机译:在Nam Ngiep 1水电项目的主水坝建设过程中,RCC浇筑的出色生产率使该RCC水坝成为迄今为止世界上建造最快的水坝之一,但也将其评为最高效的水坝之一根据配料厂的额定容量以及生产和安置的RCC的实际数量建造的大坝。本文讨论了在施工过程中采用的施工技术和解决方案,以在保持所需的高质量的同时实现高生产率和效率。 @@ 1。 B.福布斯,“在一些近期的RCC水坝上的意义创新及其发展”,第六届国际碾压混凝土水坝(RCC)水坝国际研讨会,西班牙萨拉戈萨; 2012。@@ 2。 M.R.H. Dunstan,“ RCC大坝的头30年:重大水电开发和碾压混凝土大坝的技术进步”,CHINCOLD出版物,2015年。@@ 3。 MR。Dunstan,CHINCOLD出版,“ RCC的建造速度应有多快?实质性水电开发和碾压混凝土大坝的技术进步”; 2015。@@ 4。 Y.Aosaka,T.Seoaka,福布斯,B.,Cockcroft,JJE.M.,Y.Murakami和M.Asakawa,“ Nam Ngiep 1水电RCC大坝的试验混合和全面试验路堤项目”,会议记录,ICOLD第85届年会,捷克共和国布拉格; 2017。@@ 5。 Y. Matsumoto,K。Munnavongchanh,K。Kosaka和J.EM. Cockcroft,“ Nam Ngiep 1水电项目概述,包括老挝人民民主共和国最高水坝的设计和施工”,会议记录,第六国际亚洲水资源和水电开发会议,老挝万象,2016年。

著录项

  • 来源
  • 作者单位

    Nam Ngiep 1 Power Company, Lao PDR S. Nagasaka, Obayashi Corporation, Lao PDR;

    Nam Ngiep 1 Power Company, Lao PDR S. Nagasaka, Obayashi Corporation, Lao PDR;

    Nam Ngiep 1 Power Company, Lao PDR S. Nagasaka, Obayashi Corporation, Lao PDR;

    Nam Ngiep 1 Power Company, Lao PDR S. Nagasaka, Obayashi Corporation, Lao PDR;

    Nam Ngiep 1 Power Company, Lao PDR S. Nagasaka, Obayashi Corporation, Lao PDR;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号