首页> 外文期刊>International Journal of Enterprise Information Systems >Uncertainty in ERP-Controlled Manufacturing Systems
【24h】

Uncertainty in ERP-Controlled Manufacturing Systems

机译:ERP控制的制造系统中的不确定性

获取原文
获取原文并翻译 | 示例
           

摘要

The use of Enterprise Resource Planning (ERP) is becoming increasingly prevalent in many modern manufacturing enterprises. However, knowledge of their performance when perturbed simultaneously by several significant uncertainties is not as widespread as it should have been. This paper presents the developmental and experimental work on modeling uncertainty within an ERP multi-product, multi-level dependent demand manufacturing planning, and scheduling system in a simulation model developed using ARENA/SIMAN. To enumerate how uncertainty affects the performance of an ERP-controlled manufacturing system, the percentages of Finished Products Delivered Late (FPDL) and Parts Delivered Late (PDL) are measured. Sensitivity analysis shows that PDL gives a more accurate effect. Simulation results are analyzed using Analysis of Variance (ANOVA), which identifies four uncertainties; namely, late delivery from suppliers, machine breakdowns, unexpected/urgent changes to machine assignments, and customer design changes, which significantly affect PDL. Some uncertainties are found significantly interactive in two and three ways. They produce either knock-on and/or compound effects, a factor not generally recognized as a criterion for decision-making.
机译:在许多现代制造企业中,企业资源计划(ERP)的使用正变得越来越普遍。但是,当同时受到几个重大不确定因素的干扰时,对其性能的了解并不如应有的那样广泛。本文介绍了在使用ARENA / SIMAN开发的仿真模型中,ERP多产品,多层次依赖需求制造计划和调度系统中的不确定性建模的开发和实验工作。为了枚举不确定性如何影响ERP控制的制造系统的性能,测量了延迟交货的成品(FPDL)和延迟交货的零件(PDL)的百分比。敏感性分析表明,PDL可以提供更准确的效果。仿真结果使用方差分析(ANOVA)进行分析,确定了四个不确定性。即,供应商的延迟交货,机器故障,机器分配的意外/紧急更改以及客户设计更改,这些都会严重影响PDL。发现一些不确定性以两种和三种方式显着地相互作用。它们会产生连锁效应和/或复合效应,这是通常未被认为是决策标准的因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号