The Port of Durban (PoD) is currently upgrading its existing power supply to a supply voltage of 132 kV. The existing 33 kV supply cables are old and have exceeded their designed life resulting in unplanned power outages. The existing 33 kV switchgear is old and obsolete as a result it is difficult to maintain. The existing maximum demand capacity will not be able to cater for the additional loads required for the planned expansion developments.The electrical load flow is a very important and fundamental tool for the analysis of any power systems and in the operations as well as planning stages. The electrical load flow study was conducted using PowaMaster software to analyse the behaviour of PoD's electrical network post implementation of the new substation onto the currently existing network. In performing the electrical load flow study, load diversification is one of the critical input parameters that was considered because it is a true representation of the network behavior. The load forecasting was based on the planned developments commissioned between 2017 and 2027. The electrical load flow study was also to validate if all the new selected reticulation cables and transformers as part of the design have been correctly sized and will be able to operate reliably without compromising security of firm supply with the implementation of all the planned future loads. This report entails the results of the electrical load flow study that was conducted to analyse the voltage stability and system reliability of the PoD's electrical network in conjunction with new 132/33 kV Langeberg Substation.
机译:目前德班港(POD)目前正在将其现有电源升级到132 kV的电源电压。现有33辆KV供应电缆陈旧,已超出其设计的寿命,从而导致计划的停电。现有的33 kV开关设备陈旧而过时,难以维护。现有的最大需求容量将无法满足计划扩展开发所需的额外载荷。电负荷流是一种非常重要而基本的工具,用于分析任何电力系统以及在运营中以及规划阶段。使用POWAMAST软件进行电负载流程,以分析POD电网在当前现有网络上实现新变电站的电气网络的行为。在执行电负载流程研究时,负载多样化是所考虑的关键输入参数之一,因为它是网络行为的真实表示。负载预测基于2017年和2027年之间的计划开发。电汇流程研究还用于验证所有新的选择标注电缆和变压器作为设计的一部分是否已正确尺寸,并且能够可靠地运行利用所有计划未来负荷的实施,妥协了公司供应安全性。本报告需要进行电负载流程的结果,以分析POD电网的电压稳定性和系统可靠性与新的132/33 kV Langeberg变电站结合。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号