...
首页> 外文期刊>International journal of electrical power and energy systems >A grid operation model: Resource demand for an adequate incident management in high-, medium-, and low-voltage grids
【24h】

A grid operation model: Resource demand for an adequate incident management in high-, medium-, and low-voltage grids

机译:电网运营模型:高,中,低压电网中对适当事件管理的资源需求

获取原文
获取原文并翻译 | 示例
           

摘要

Based on the regulation of grid fees and the regulatory requirements on the quality of supply, grid operators attempt to find an optimal balance between costs and quality of supply. One main aspect of the quality of supply is the non-availability of supply, which strongly depends on the duration of the restoration process after incidents and therefore on the availability of resources. Focusing on the operational processes after incidents in low-, medium-, and high-voltage grids, this paper presents a detailed grid operation model which allows to quantify the relation between the configuration of resources and the corresponding costs and quality of supply. To assess the "risk" of incidents with no interruption of supply, the power-at-risk is introduced. Depending on legal, regulatory, or strategic requirements, the model allows to evaluate and compare different configurations of resources and the resulting quality of supply.
机译:基于对电网费用的监管以及对供应质量的监管要求,电网运营商试图在成本和供应质量之间找到最佳平衡。供应质量的一个主要方面是供应的不可用性,它在很大程度上取决于事件发生后恢复过程的持续时间,因此也取决于资源的可用性。针对低,中和高压电网事故后的运行过程,本文提出了详细的电网运行模型,该模型可以量化资源配置与相应成本和供应质量之间的关系。为了在不中断供应的情况下评估事件的“风险”,引入了有风险的电源。根据法律,法规或战略要求,该模型可以评估和比较不同的资源配置以及由此产生的供应质量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号