...
首页> 外文期刊>International journal of electrical power and energy systems >Restoring recloser-fuse coordination by optimal fault current limiters planning in DG-integrated distribution systems
【24h】

Restoring recloser-fuse coordination by optimal fault current limiters planning in DG-integrated distribution systems

机译:通过DG集成配电系统中的最佳故障限流器规划来恢复重合闸熔断器协调

获取原文
获取原文并翻译 | 示例

摘要

In this paper, the Fault Current Limiter (FCL) is used to restore the coordination between the protection devices in distribution systems with high-level of DG penetration. The FCL allocation may be described as an optimization problem involving multiple objective functions which are contradictory and of different dimensions. So, it is formulated as a multi-objective constrained nonlinear programming problem. The interaction among different objectives gives rise to a set of compromised solutions, largely known as the Pareto-optimal solutions. The objectives are to simultaneously minimize: the increase in fault current levels due to the penetration of DG, voltage sag, and the total cost (size) of required limiters. The optimization problem is solved using Particle Swarm Optimization (PSO). The method is applied to two distribution test systems. Effects of different operating factors are assessed. Comparative analysis of results is provided. (C) 2015 Elsevier Ltd. All rights reserved.
机译:在本文中,故障电流限制器(FCL)用于恢复具有较高DG渗透水平的配电系统中保护设备之间的协调性。 FCL分配可以描述为涉及多个目标函数的优化问题,这些目标函数相互矛盾且具有不同的维度。因此,它被表述为一个多目标约束非线性规划问题。不同目标之间的相互作用产生了一系列折衷的解决方案,通常被称为帕累托最优解。目的是同时最小化:由于DG的渗透,电压骤降以及所需限制器的总成本(尺寸)而导致的故障电流水平的增加。使用粒子群优化(PSO)解决了优化问题。该方法应用于两个分布测试系统。评估了不同操作因素的影响。提供结果的比较分析。 (C)2015 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号