Reducing completion time and optimizing resource use of resource-constrained construction operation by means of simulation modeling

机译:通过仿真建模减少资源受限施工操作的完成时间和优化资源利用

获取原文
获取原文并翻译 | 示例
           

摘要

Traditionally, critical path method (CPM) is widely used with manual resource assignment for planning and scheduling of the construction projects. This is predominant in the construction industry of Bangladesh. Therefore, the industry often faces challenges to complete construction projects in minimum possible time with optimum use of resources. Although, concurrency-based scheduling is an efficient tool to reduce construction completion time, manual formulation of plans for construction operations using the technique is cumbersome (because of complex nature of real-life construction operations, for instance a real-life construction work involves complex interaction between activities, limited number of resources and resource-sharing among activities, etc.) With this viewpoint, the present study aims to introduce computer-aided simulation modelling-based approach to reduce the completion time of a resource-constrained construction operation utilizing the features of concurrency-based scheduling. The study also proposes a method to optimize the resource use of construction operation. A real-life construction work has been considered as the case construction operation for this study. Results indicate that the simulation model developed for the case project can efficiently generate work-flow plans with reduced construction durations compared to the work-flow plan of the actual schedule. The model can also help to optimize the use of resources. Furthermore, the model developed for the case project can easily be reshaped, expanded and applied to other construction operations.
机译:传统上,关键路径方法(CPM)广泛用于手动资源分配,用于规划和调度建设项目。这是孟加拉国建设行业的主要原因。因此,该行业往往面临挑战,以最低可能使用资源的最低可能时间来完成建筑项目。虽然,基于并发的调度是一种有效的工具来减少施工完成时间,但手动配方使用该技术的施工操作计划是麻烦的(由于现实施工操作的复杂性质,例如真实的建设工作涉及复杂活动之间的互动,资源数量有限,在活动之间进行资源共享等)与此观点来说,目前的研究旨在引入基于计算机辅助模拟建模的方法,以减少利用资源受限施工操作的完成时间基于并发的调度的功能。该研究还提出了一种优化施工操作资源使用的方法。现实生活建设工作被认为是本研究的案例施工操作。结果表明,与实际时间表的工作流程相比,为案例项目开发的仿真模型可以有效地产生工作流程计划,其施工持续时间降低。该模型还可以帮助优化资源的使用。此外,为案例项目开发的模型可以很容易地重塑,扩展和应用于其他施工操作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号