首页> 外文期刊>International Journal of Computer Systems Science & Engineering >An Upper Bound of Task Loads in a Deadline-d all Busy Period for Multiprocessor Global EDF Real-Time Systems
【24h】

An Upper Bound of Task Loads in a Deadline-d all Busy Period for Multiprocessor Global EDF Real-Time Systems

机译:多处理器全局EDF实时系统的最后一个繁忙时段的任务负载上限

获取原文
获取原文并翻译 | 示例
           

摘要

This paper addresses a number of mathematical issues related to multiprocessor global EDF platforms. We present a deadline-d all busy period and backward interference which are important concepts for multiprocessor EDF systems, and some general schedulability conditions for any studied job are proposed. We formally prove that at most m-1 different tasks' jobs could contribute their execution time to an interval starting with a Pbasy-d, and we propose an approach for computing an exact upper bound of the total deadline-d task load in a given interval. Therefore, the proposed results are important foundations for constructing exact schedulability analyses of global EDF scheduling systems.
机译:本文解决了与多处理器全局EDF平台有关的许多数学问题。我们提出了一个截止日期-所有繁忙时期和向后干扰,这是多处理器EDF系统的重要概念,并提出了针对任何研究工作的一些一般可调度性条件。我们正式证明,最多m-1个不同任务的工作可以将它们的执行时间贡献给一个以Pbasy-d开头的时间间隔,并且我们提出了一种方法,用于计算给定条件下d任务总负荷的确切上限间隔。因此,所提出的结果是构建全球EDF调度系统的精确可调度性分析的重要基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号