首页> 外文期刊>International Journal of Computational Complexity and Intelligent Algorithms >A hybrid cuckoo search metaheuristic algorithm for solving single machine total weighted tardiness scheduling problems with sequence dependent setup times
【24h】

A hybrid cuckoo search metaheuristic algorithm for solving single machine total weighted tardiness scheduling problems with sequence dependent setup times

机译:求解时间与序列相关的单机总加权迟到调度问题的混合杜鹃搜索元启发式算法

获取原文
获取原文并翻译 | 示例
       

摘要

In this paper, we present a hybrid algorithm based on cuckoo search algorithm to solve the single machine total weighted tardiness (SMTWT) scheduling problems with sequence dependent setup times which have been proved to be strongly NP-hard. Three different dispatching rules are incorporated with the initial random solutions of the cuckoo search (CS) algorithm to improve the solution quality. Computational results show that the proposed algorithm is very competitive to many metaheuristic algorithms in the literature.
机译:在本文中,我们提出了一种基于杜鹃搜索算法的混合算法,以解决单机总加权拖延(SMTWT)调度问题,该问题具有依赖于序列的建立时间,并且已证明具有很强的NP难度。杜鹃搜索(CS)算法的初始随机解决方案结合了三种不同的调度规则,以提高解决方案的质量。计算结果表明,与文献中的许多元启发式算法相比,该算法具有较强的竞争力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号