...
首页> 外文期刊>International Journal of Civil Engineering,Transaction A:Civil Engineering >Analysis of Displacement Response of the Ermenek Dam Monitored by an Integrated Geodetic and Pendulum System
【24h】

Analysis of Displacement Response of the Ermenek Dam Monitored by an Integrated Geodetic and Pendulum System

机译:大地摆系统监测的Ermenek大坝位移响应分析

获取原文
获取原文并翻译 | 示例
           

摘要

This paper studies the structural behavior of the Ermenek arch dam, the second highest dam in Turkey. The investigated period covers the stage of the last-quarter part of first filling (1 and 1/2 year) and the begging of its operational lifetime (1year). Displacement responses of the dam to temperature load and water load are assessed in detail based on both geodetic and pendulum monitoring records. In addition, the present study explores the possibility and advantage of integrating pendulum-measured signals with geodetic-measured signals for the dam deformation monitoring. The analysis results reveal that pendulum-derived displacements at four gallery levels, along the vertical cross section of the dam, which exhibit periodicity and linear trend with different slope due to seasonal temperature oscillation and linearly increased reservoir level, respectively. Comparative evaluation of the results shows that there is very good agreement between geodetic-derived displacement in radial direction at the middle of the crest and corresponding pendulum-derived displacement.
机译:本文研究了土耳其第二高的Ermenek拱坝的结构特性。研究期涵盖第一次填充的最后一个季度阶段(1年和1/2年)以及其使用寿命(1年)的开始。根据大地测量和钟摆监测记录,详细评估了大坝对温度负荷和水负荷的位移响应。此外,本研究探索了将摆测信号与大地测量信号相集成以进行大坝变形监测的可能性和优势。分析结果表明,沿大坝垂直截面在四个通道水平上的摆引起的位移,由于季节温度振荡和线性增加的储层水平,分别表现出具有不同斜率的周期性和线性趋势。结果的比较评估表明,在波峰中间的大地测量径向位移与相应的摆运动位移之间有很好的一致性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号