Predicting the construction duration of building projects using artificial neural networks

机译:使用人工神经网络预测建筑项目的工期

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The accurate prediction of the duration of a construction project represents a critical factor for the feasibility study of this project. Employers are in an urgent need for reliable information about the construction duration in this early stage of the project. Such information can materially help project managers create a cash and material flow plan in a pre-set time. This paper aims to develop an artificial neural network (ANN) model for predicting the expected construction duration of building projects in its early stage, where no detailed planning is available. The MATLAB program was used as a suitable environment for developing the proposed model. The required field data was collected from 130 building projects in Egypt, which fall within the appropriate sample size. Testing the validity of the model clearly showed that it has a good prediction capability with a maximum error of 14%.
机译:对建设项目工期的准确预测是该项目可行性研究的关键因素。在项目的这个早期阶段,雇主迫切需要可靠的施工时间信息。这些信息可以从实质上帮助项目经理在预设时间内创建现金和物料流计划。本文旨在建立一个人工神经网络(ANN)模型,以预测建筑项目在没有详细计划的早期阶段的预期建设工期。 MATLAB程序被用作开发建议模型的合适环境。所需的现场数据是从埃及的130个建筑项目中收集的,属于适当的样本量之内。测试模型的有效性清楚地表明,该模型具有良好的预测能力,最大误差为14%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号