首页> 外文期刊>International journal of advanced operations management >Operability and maintainability obstacles: an exploratory factor analysis approach
【24h】

Operability and maintainability obstacles: an exploratory factor analysis approach

机译:可操作性和可维护性障碍:探索性因子分析方法

获取原文
获取原文并翻译 | 示例
           

摘要

As the population grows, more infrastructure projects are required too for economic growth of countries however, their maintenance becomes more significant after the completion. It is essential to pay especial attention to the operation and maintenance (O&M) to sustain the value of invested budget. Proper O&M implementation has however experienced some obstacles and an initial step in resolving them is to identify them. This paper aims to identify and prioritise the O&M implementation obstacles in infrastructure projects in Iran. A comprehensive list of obstacles is prepared through a deep literature review and then used of a questionnaire survey. The gathered data from the questionnaires were analysed using the robust exploratory factor analysis method. Twenty-three obstacles are categorised under six themes of management, structure, culture, education and learning, communication, and finance. Results show that management obstacles should be considered in priority for such infrastructure projects, and by solving them.
机译:随着人口的增长,对于国家经济增长,需要更多的基础设施项目,但完成后,他们的维护变得更加重要。必须特别注意经营和维护(O&M)以维持投资预算的价值。然而,适当的O&M实现经历了一些障碍和解决它们的初步步骤是识别它们。本文旨在识别并确定伊朗基础设施项目中的O&M实施障碍。通过深入的文献综述,然后使用调查问卷调查,制定了全面的障碍清单。通过稳健的探索因子分析方法分析来自调查问卷的收集数据。二十三个障碍根据管理,结构,文化,教育和学习,沟通和金融的六个主题分类。结果表明,应优先考虑管理障碍,以优先考虑此类基础设施项目,并通过解决这些项目。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号