首页> 外文期刊>International Gas Report >India plans gas pool in 8 months
【24h】

India plans gas pool in 8 months

机译:印度计划在8个月内建立天然气池

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

India's oil ministry plans to develop a policy and mechanism for pooled natural gas pricing in six to eight months. The change is designed to ensure that consumers across the country pay a uniform price for gas, oil secretary S. Sundareshan told an industry gathering in New Delhi October 31.rnOnce state-backed Petronet LNG's new 2.5 million mt terminal at Kochi in the southern part of India has been completed, consumers in Mumbai and New Delhi would pay only half the price a consumer pays for LNG from Reliance Industries, which would be totally unacceptable, Sundareshan told a pre-conference session on LNG held ahead of Petrotech 2010, which begins on November 1. Petronet LNG has contracted to receive 1.5 million mt/year of LNG from ExxonMobil's Gorgon project in Western Australia for 20 years from 2014.
机译:印度石油部计划制定一项政策和机制,以在六到八个月内汇总天然气价格。石油部长S. Sundareshan于10月31日在新德里举行的一次行业聚会上表示,这一变更旨在确保全国范围内的消费者以统一的价格购买天然气。 Sundareshan在2010年Petrotech大会召开前举行的关于液化天然气的会前会议上说,印度的印度市场已经完成,孟买和新德里的消费者只需支付消费者从信实工业公司购买液化天然气的价格的一半,这是完全不能接受的。 11月1日,Petronet液化天然气已签订合同,从2014年开始,埃克森美孚公司在西澳大利亚的Gorgon项目每年将接收150万吨/年的液化天然气。

著录项

  • 来源
    《International Gas Report》 |2010年第660期|p.14|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号