...
首页> 外文期刊>International environment reporter >India Invites Bids for 750 MW of Solar Power Projects; Half Must Have Domestic Content
【24h】

India Invites Bids for 750 MW of Solar Power Projects; Half Must Have Domestic Content

机译:印度为750兆瓦的太阳能发电项目招标;一半必须具有国内内容

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Indian government has invited bids to install 750 megawatts of grid-connected solar photovoltaic projects under the second phase of the National Solar Mission. All projects will be eligible for "viability gap funding" from the government, according to an Oct. 4 announcement on the Solar Energy Corporation of India's website. Bids are due by Nov. 29. Draft guidelines announced simultaneously by the Ministry of New and Renewable Energy specify a domestic content mandate. Of the 750 megawatt total, 375 megawatts of capacity would have to be installed using solar cells and modules made in India. Developers may compete in either or both of the open and domestic content categories.
机译:印度政府已邀请投标,在国家太阳能任务第二阶段下安装750兆瓦的并网太阳能光伏项目。根据印度太阳能公司网站10月4日的公告,所有项目都将有资格获得政府的“可行性缺口资金”。投标将于11月29日之前完成。新能源与可再生能源部同时宣布的准则草案指定了国内内容授权。在750兆瓦的总容量中,必须使用印度制造的太阳能电池和模块来安装375兆瓦的容量。开发人员可以在公开和国内内容类别中的一个或两个中竞争。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号