A Topcut concrete processor from Wimmer Hartstahl GmbH proved the ideal solution during renovation work on the Tanzberg road tunnel in Austria, which consists of two side-by-side 2.5 km long tunnels. At the beginning of 2008, it was decided to upgrade the north tunnel ventilation system and German contractor Tieber was brought on to remove the intermediate deck. This was achieved through the use of a process Tieber had developed for work carried out in 2004 on the Amberg Tunnel on the Rhineland motorway. This involved the use of the Topcut to break up the heavily reinforced concrete deck, which was between 150 and 200 mm thick. The resulting debris fell into a specially fabricated hopper manufactured by Tieber, and was then transferred onto trucks for removal off-site. This resulted in a substantial reduction in the amount of equipment required for the job, reducing the impact to the remaining structure of the tunnel.
机译:Wimmer Hartstahl GmbH的Topcut混凝土加工机在奥地利坦茨伯格公路隧道的翻新工作中证明了理想的解决方案,该隧道由两条并排的2.5公里长的隧道组成。 2008年初,决定升级北部隧道通风系统,并聘请德国承包商铁伯(Tieber)拆除中间甲板。这是通过使用Tieber为2004年在莱茵兰高速公路上的Amberg隧道进行的工作开发的工艺来实现的。这涉及使用Topcut来打碎厚150至200毫米的钢筋混凝土甲板。产生的碎屑落入由铁伯(Tieber)制造的特制料斗中,然后转移到卡车上以进行异地清除。这大大减少了工作所需的设备数量,减少了对隧道剩余结构的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号