...
【24h】

South African hope

机译:南非希望

获取原文
获取原文并翻译 | 示例
           

摘要

An illustration of how gloomy the South African construction environment has become was given by contractor Basil Read's warning to warn shareholders that it expected headline earnings per share for the six months to June to fall some 270%. Other construction companies such as WG Wearne and Esor have also reported weak results. "There is still overcapacity in the market, capacity was built leading up to the World Cup 2010," said Stanlib Industrials Analyst Anashrin Pillay. "There's a lack of major projects coming to the market, makingthe operating environment more competitive - no new power stations, road projects etcetera." This, he says, left firms with limited pricing power asthey josded for thin-on-the ground projects.
机译:承包商Basil Read的警告警告了股东,南非的建筑环境已经变得多么令人沮丧,该警告称,预计截至6月份的六个月的整体标题每股收益将下降约270%。 WG Wearne和Esor等其他建筑公司的业绩也很差。 Stanlib工业分析师Anashrin Pillay表示:“市场仍然存在产能过剩的问题,产能已经提高到2010年世界杯。” “市场上缺少大型项目,这使运营环境更具竞争力-没有新的发电站,道路项目等。”他说,这使定价能力有限的公司纷纷加入地面项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号