...
【24h】

SDLG in Morocco

机译:SDLG在摩洛哥

获取原文
获取原文并翻译 | 示例
           

摘要

Thought to be Morocco's largest quarry, CCGT Granulats, lies in a rural location between Serat and Rabat. Operations there are on the rise, as demand for aggregates in the country booms to meet the needs of the government's highway expansion plan. Output currently stands at 5,000 m~3 of aggregates per day. CCGT owns the landmark quarry, together with several others in the country, and has been expanding its equipment fleet to help with the growing workload. Among the machines added in the past year are four SDLG units from Shandong Lingong Construction Machinery, known as Lingong. Three machines are at the Granulats location and one is at its Concentrium facility close to Marrakesh.
机译:CCGT Granulats被认为是摩洛哥最大的采石场,位于塞拉特(Serat)和拉巴特(Rabat)之间的乡村地区。随着该国对骨料的需求不断增长,以满足政府的公路扩张计划的需求,当地的运营活动正在增加。目前产量为每天5,000 m〜3。 CCGT与该国的其他几家公司一起拥有该地标采石场,并一直在扩大其设备队以帮助增加工作量。在过去一年中增加的机器中,有山东临工工程机械的四个SDLG单位,即临工。三台机器在Granulats地点,一台在其位于马拉喀什附近的Concentrium设施中。

著录项

  • 来源
    《International Construction》 |2014年第6期|39-39|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号