Alarge-scale systems design and construction effort is a complex endeavour that can become unwieldy when the project team spans several continents. The complexities of communicating across different time zones, cultures and languages can rapidly escalate into challenging issues. If at all practical, a site survey by the team is an excellent opportunity to establish the project goals, communication protocols, as well as review the conditions of the proposed site. In addition, protocols must be established to address time zone differences. One issue that is common to all projects is the deadline. Most large-scale projects involve elements that can broadly fall into two categories: 1. Those events that can be planned for, pre-staged and subsequently controlled (strategic events) 2. Those events that are not, or cannot be planned for (tactical events) Taking the time to detail the scope of the project, its critical path milestones, and those events that will have the greatest impact to the schedule is the first and most important step in the planning effort.
机译:大规模的系统设计和构建工作是一项复杂的工作,当项目团队跨越多个大洲时,可能会变得笨拙。跨不同时区,文化和语言进行交流的复杂性可以迅速升级为具有挑战性的问题。如果可行的话,团队进行现场调查是确定项目目标,沟通协议以及审查拟建现场条件的绝佳机会。另外,必须建立协议以解决时区差异。所有项目共有的一个问题是期限。大多数大型项目涉及的要素可以大致分为两类:1.可以计划,预先安排并随后控制的事件(战略事件)2.尚未或无法计划的事件(战术事件)事件)花时间详细说明项目的范围,关键路径的里程碑以及那些对进度表影响最大的事件,这是计划工作的第一步,也是最重要的一步。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号