...
首页> 外文期刊>Inside FERC >Regulatory hurdles prompt delays in MVP, Southgate pipeline target dates
【24h】

Regulatory hurdles prompt delays in MVP, Southgate pipeline target dates

机译:监管障碍迅速延迟MVP,Southgate Pipeline目标日期

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Equitrans Midstream pushed back the in-service targets for the 303- mile, 2 Bcf/d Mountain Valley Pipeline and the 75-mile Southgate natural gas pipeline extension, citing regulatory delays, including requests from Virginia and West Virginia for more time to evaluate water quality applications. MVP and the Southgate extension combined would move Appalachian Basin gas to mid-Atlantic markets and then on to North Carolina, but have faced multiple legal and regulatory hurdles amid litigation from a coalition of environmental groups.
机译:Equitrans中游推回服务的303英里,2个BCF / D山谷管道和75英里的南京天然气管道延伸,引用了监管延误,包括弗吉尼亚和西弗吉尼亚州的要求,更多时间评估水资源优质应用。 MVP和南京州延期联合将Appalachian盆地气体转移到大西洋中部市场,然后将北卡罗来纳州迁至北卡罗来纳州,但在环境群体联盟的诉讼中面临多元的法律和监管障碍。

著录项

  • 来源
    《Inside FERC》 |2021年第10期|19-19|共1页
  • 作者

    Maya Weber;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号